
March 2009
Miamisburg's new Middle School, designed by SSOE, features a unique design and look which is clearly noticeable in the conceptual rendering of the school.
The school will be 172,500 sq. ft. and house approximately 1500 students in grades 6-8 when it is completed in 2011.
Construction of the school will begin in May. Pre-cast concrete planks will be used for the second floor and roof. The roof will be constructed with light gauge metal trusses with asphalt shingles and include overhangs with detailed eaves.